What is project planning? Explain types of project plan.

 Project Planning:

Project planning involves breaking down the work into parts and assigning these to project team members, anticipate problems that might arise, and prepare tentative solutions to those problems. The project plan, which is created at the start of a project, is used to communicate how the work will be done to the project team and customers, and to help assess progress on the project.


Types of Project plan

  • Validation Plan
  • Configuration management plan
  • Maintenance plan
  • Staff Development Plan


1) Validation plan

The validation plan describes the approach, resources, and schedule used for system validation. It is intended to show that the program does what the user requires.


2) Configuration and management plan

This plan includes the management of system change. When a system has maintained the role of the CM team is to ensure that changes are incorporated in a controlled way. This plan includes configuration management procedures and structures to be used.


3) Maintenance plan

It predicts the maintenance requirements of the system, maintenance cost, and effort required.


4) Staff development plan

It describes how the skill and experience of the project team member will be developed.


Comments

Popular posts from this blog

Suppose that a data warehouse for Big-University consists of the following four dimensions: student, course, semester, and instructor, and two measures count and avg_grade. When at the lowest conceptual level (e.g., for a given student, course, semester, and instructor combination), the avg_grade measure stores the actual course grade of the student. At higher conceptual levels, avg_grade stores the average grade for the given combination. a) Draw a snowflake schema diagram for the data warehouse. b) Starting with the base cuboid [student, course, semester, instructor], what specific OLAP operations (e.g., roll-up from semester to year) should one perform in order to list the average grade of CS courses for each BigUniversity student. c) If each dimension has five levels (including all), such as “student < major < status < university < all”, how many cuboids will this cube contain (including the base and apex cuboids)?

Suppose that a data warehouse consists of the four dimensions; date, spectator, location, and game, and the two measures, count and charge, where charge is the fee that a spectator pays when watching a game on a given date. Spectators may be students, adults, or seniors, with each category having its own charge rate. a) Draw a star schema diagram for the data b) Starting with the base cuboid [date; spectator; location; game], what specific OLAP operations should perform in order to list the total charge paid by student spectators at GM Place in 2004?

Pure Versus Partial EC